FIG. 1.
Locations of the sampling sites used in this study. The background site (HCK20.6) is located ∼23 km (linear distance) upstream from site EFK23.4. The industrial facility (Y-12 plant) is indicated schematically. (Adapted from reference 64 with permission of the publisher.)
