Skip to main content
. 2011 Mar 25;6(3):e18203. doi: 10.1371/journal.pone.0018203

Table 4. Parameters of the slope analysis fitted to individual data.

Task c (squared) (± SD) slope (± SE) R2(± SD)
Temporal Generalisation −772.19±3605.4 0.06±0.002 0.98±0.0009
Temporal Expectancy −2007.4±12810.06 0.16±0.01 0.98±0.0005

These data describe the relationship between timing variability and the standard duration (see also Figure 5). The intercept (c) represents non-temporal sources of variability and the slope represents timing variability.