Skip to main content
. 2009 Jul-Dec;4(2):63–75.

Table 5.

Checkpoint batches with their predicted and measured values of Q2, Q16 and Q24

Batch X1 X2 Q2
Q16
Q24
Measured Predicted Measured Predicted Measured Predicted
C1 -0.5 0.5 2.25 ± 0.22 1.19 76.32 ± 0.61 75.91 99.9 ± 1.72 101.20
C2 0.5 -0.5 8.45 ± 1.20 7.44 70.26 ± 0.22 68.20 94.6 ± 1.28 95.53