Table 5.
Batch | X1 | X2 | Q2 |
Q16 |
Q24 |
|||
---|---|---|---|---|---|---|---|---|
Measured | Predicted | Measured | Predicted | Measured | Predicted | |||
C1 | -0.5 | 0.5 | 2.25 ± 0.22 | 1.19 | 76.32 ± 0.61 | 75.91 | 99.9 ± 1.72 | 101.20 |
C2 | 0.5 | -0.5 | 8.45 ± 1.20 | 7.44 | 70.26 ± 0.22 | 68.20 | 94.6 ± 1.28 | 95.53 |