Skip to main content
. Author manuscript; available in PMC: 2011 Jun 1.
Published in final edited form as: IEEE Trans Nucl Sci. 2009;56(5):2636–2643. doi: 10.1109/TNS.2009.2023444

TABLE I.

Summary of the Simulation Setup for Three Multiplexing Schemes

Phantom No. of pinholes ROR (cm) Collimator (cm) % of multiplexing Count level Detector size Note
Scheme (1) MOBY 4 4.8 7 0, 22.7, 34, 44.2 1M, 4M 12cm×l2cm Same magnification and detection efficiency

Hot sphere
Scheme (2) MOBY 4 3 5,7,8,10 0,24,41,61 0.25M, 1M, 4M 12cm×l2cm Same detection efficiency with changed magnification
Scheme (3) MOBY 1,5,7,9,13 2.5*/3.5 14 0,4,7,10,25,60 Same acq. time 40cm×40cm Same magnification with changed detection efficiency



1,4,5,7,9 7 0,11,28,40,50,3 12cm×12cm
*

2.5cm for single pinhole imaging geometry only