Skip to main content
. 2011 Mar 4;2:23. doi: 10.3389/fpsyg.2011.00023

Figure 2.

Figure 2

Average first session accuracy during training in blocks of four stimulus sets and performance during the 10 transfer sessions. The dotted line indicates chance for the task.