Skip to main content
. 2010 Feb 11;15(5):291–302. doi: 10.1159/000283006

Fig. 5.

Fig. 5

The difference in acoustic stapes velocity due to the static loading of an AMEI on the RW (ΔHTV). Lines and shading show across-bone means and 95% CI, respectively. a 1-mm ball tip before drilling the RW niche. b 0.5-mm ball tip before drilling the RW niche. c 1-mm ball tip after drilling the RW niche. d 0.5-mm ball tip after drilling the RW niche.