Skip to main content
. 2011 May 18;8(65):1796–1803. doi: 10.1098/rsif.2011.0153

Figure 6.

Figure 6.

Phase plot illustrating the average time in years required to attain the development equilibrium from initial conditions that are reinforced by safety nets. α = 0.06, ν = 0.02, r = 0.05, β1 = 40, ɛ = 15, δ = 0.15, ρ = 90, κ = 100, M0 = 100, σ = 3.