Skip to main content
. 2011 Oct 14;7(4):184–198. doi: 10.6026/97320630007184

Figure 5.

Figure 5

Superposition of the final snapshots of the WT (green), E96Q (grey) and ED simulations (blue). On the left and right are global and closeup views shown. The simulations with one Mg2+ (A and B site) were run over 1 ns, while the simulations with two Mg2+ (A+B) were run over 2 ns.