Skip to main content
. 2011 Dec 20;135(23):234108. doi: 10.1063/1.3668100

Figure 1.

Figure 1

Uncertainty vs βmax for the reversible isomerization process. For each βmax, four independent sdwSSA estimates are obtained. The two dotted red lines connect the minimum and maximum uncertainties at each βmax value. The blue line corresponds to the uncertainty obtained from K = 106 swSSA simulations, parameterized with the optimal IS parameters listed in Table 3. The four green lines represent uncertainties of dwSSA estimates.