Skip to main content
. 2009 Jan 8;9(1):311–326. doi: 10.3390/s90100311

Table 2.

Temperature and Pressure of Ambient Air, DFC and Sewage Surface during Sampling.

Sampling date and points Temperature (°C) Ambient pressure(mmHg)
Date(season) Sampling Points Ambient DFC Sewage
Summer A.M Primary settling basin 31.5 29.3 22.0 751.5
Aeration basin 31.0 26.8 27.9
Final settling basin 29.5 27.9 23.0
P.M Primary settling basin 31.9 30.4 22.9
Aeration basin 32.4 28.6 26.1
Final settling basin 31.4 32.1 23.5
Winter A.M Primary settling basin 11.2 12.6 14.1 756.5
Aeration basin 9.8 16.4 11.6
Final settling basin 10.1 12.9 13.2
P.M Primary settling basin 9.1 18.2 14.0
Aeration basin 10.6 11.7 13.0
Final settling basin 10.5 14.6 12.7
Winter A.M Primary settling basin 9.5 9.5 12.2 754.6
Aeration basin 7.8 8.9 11.5
Final settling basin 8.4 14.7 11.7
P.M Primary settling basin 9.4 23.3 12.1
Aeration basin 9.2 18.7 11.7
Final settling basin 9.4 20.4 11.4