Skip to main content
. 2012 Mar 1;7(3):e32569. doi: 10.1371/journal.pone.0032569

Table 1. Power line name, type of line (transmission or distribution), design (experimental or control) and number of years monitored after spiral attachment.

Power line Type Length (km) Design Times after
Aranjuez E-O Distribution 2.0 Control One
Aranjuez N-S I Transmission 2.0 Experimental One
Aranjuez N-S II Transmission 4.1 Experimental One
Belvis-Cobeña Transmission 3.0 Experimental Three
Camarma-Fresno Distribution 2.0 Experimental Two
Camarma-Meco Transmission 1.6 Experimental Two
Camarma-Torote Transmission 2.1 Experimental Three
Campo Real-Valdilecha Distribution 3.2 Experimental Two
Daganzo-Alcalá Distribution 0.9 Control One
Daganzo-Fresno Rio Distribution 1.1 Control One
Daganzo-Torote Transmission 1.8 Experimental Three
El Colegio Distribution 3.0 Experimental Two
La Cueva-El Casar Distribution 1.5 Control One
Mesones Distribution 2.0 Control One
Pinto Transmission 1.5 Experimental Two
Pozuelo-Valdilecha Distribution 2.6 Experimental Two
Quer Distribution 1.4 Experimental One
San Martín de la Vega Distribution 1.7 Experimental Two
Valdepiélagos-Talamanca I Distribution 2.2 Experimental One
Valdepiélagos-Talamanca II Distribution 0.5 Control One
Valdetorres-La Jara Distribution 1.4 Control One
Villanueva-Quer Distribution 1.5 Experimental One