Skip to main content
. 2009 Sep 28;9(10):7711–7732. doi: 10.3390/s91007711

Table 1.

Performance comparison between LGR and the other three heuristics.

Heuristic Network Load (no. of data source nodes) End-to-end Delay Constraint (B) Network Size

LGRMAC 17% 11% 10%
CCA 123% 33% 50%
CNS 30% 12% 28%
GIT 49% NA* 44%
*

The GIT algorithm does not identify feasible solutions.