Skip to main content
. 2012 Jan 17;13(Suppl 1):S14. doi: 10.1186/1471-2164-13-S1-S14

Figure 7.

Figure 7

Experimental results of execution time of hybrid system for four different sequence groups. This figure describes the experimental results of execution time of hybrid system for four different sequence groups when task allocation ration increases from 2% to 30%. According to this figure, the minimal execution time of the hybrid system and the corresponding optimal allocation ratio are indicated.