Skip to main content
. Author manuscript; available in PMC: 2013 Apr 1.
Published in final edited form as: J Biomed Inform. 2011 Dec 2;45(2):323–336. doi: 10.1016/j.jbi.2011.11.012

Figure 9.

Figure 9

Time per estimated path and time per constructed simple path, derived from Figure 8 by dividing the time by number of paths. “S-Path”, “Esti”, and “Constr” stand for “Simple Path”, “Estimation”, and “Construction”, respectively.