Skip to main content
. 2012 Mar 5;12:155. doi: 10.1186/1471-2458-12-155

Figure 1.

Figure 1

Flow chart for the different dimensions of the RE-AIM framework applied to the'10,000 Steps' project. R = Reach, E = effectiveness, A = adoption, I = implementation, Mind = maintenance at individual level, MOrg = maintenance at organizational level. 1 Results of the initial evaluation with the RE-AIM framework [15]. 2 Results of the current sustainability study.