Figure 5.
(a) Simulated and measured counts as a function of the BR12 phantom thickness in energy bin 5. (b) Empirical fitting using Eq. 4 for the correlation between the simulated and the measured counts in bin 5. The counts are presented in unit of kilo-count per frame per pixel (kc/frame/pixel).