Table 4.

Average overall illness attack rates and total costs of interventions with 70% vaccination coverage

Intervention1 Delay in Initiation of Vaccination2 No Post-initiation Vaccination Delays Post-initiation Vaccination Delays3
Attack Rate (%) Cost (US$m) Attack Rate (%) Cost (US$m)

VL Pre-vaccination 12.0 47.0
VL Reactive, no delay 22.2 71.1 22.4 71.6
VL 30-day delay 22.7 72.4 24.1 75.7
VL 60-day delay 27.1 83.0 30.4 89.4
VM Pre-vaccination 0.2 19.3
VM Reactive, no delay 2.2 25.6 4.6 29.7
VM 30-day delay 8.1 39.5 13.3 50.2
VM 60-day delay 22.6 74.0 27.6 83.0
VL+A Pre-vaccination 3.3 28.3
VL+A Reactive, no delay 17.3 61.1 17.7 62.0
VL+A 30-day delay 17.9 62.5 18.4 63.9
VL+A 60-day delay 19.9 67.4 22.0 72.4
VM+A Pre-vaccination 0.1 20.7
VM+A Reactive, no delay 0.6 22.0 1.2 23.3
VM+A 30-day delay 2.4 26.2 4.4 30.9
VM+A 60-day delay 6.6 36.1 12.2 49.1
VL+S Pre-vaccination 0.7 22.0
VL+S Reactive, no delay 5.9 46.0 7.5 53.1
VL+S 30-day delay 9.5 63.0 11.0 70.6
VL+S 60-day delay 13.3 82.6 15.4 96.6
VM+S Pre-vaccination 0.04 19.1
VM+S Reactive, no delay 0.2 19.7 0.7 22.0
VM+S 30-day delay 1.5 25.9 3.2 34.7
VM+S 60-day delay 6.4 51.2 9.8 69.1
VL+A+S Pre-vaccination 0.2 21.3
VL+A+S Reactive, no delay 1.8 28.4 2.6 32.0
VL+A+S 30-day delay 2.9 33.6 3.2 35.2
VL+A+S 60-day delay 3.8 37.8 4.6 41.7
VM+A+S Pre-vaccination 0.02 20.6
VM+A+S Reactive, no delay 0.1 20.1 0.2 21.6
VM+A+S 30-day delay 0.5 22.8 0.7 23.8
VM+A+S 60-day delay 1.2 26.1 1.4 27.4

1. Abbreviations for modeled interventions: V (vaccination of up to 70% of the population), L (low efficacy), M (moderate efficacy), A (antiviral treatment and household prophylaxis of up to 10% of the population), S (school closure and social distancing).

2. Initial supply-chain delays which prevent immediate initiation of vaccination programs after the intervention trigger occurs.

3. Additional supply-chain delays, after initiation of the vaccination program, as a result of which vaccines become available in three equal batches, spaced two weeks apart