Skip to main content
. 2012 Apr 30;12(Suppl 1):S6. doi: 10.1186/1472-6947-12-S1-S6

Table 15.

Predicted Log odds for AC250

AC250 group Logistic regression equation Predicted log odds
0<AC250< = 40 Log odds = bconstant -0.72
40<AC250< = 55 Log odds = bconstant + bAC250_ind1 -0.18
55<AC250< = 75 Log odds = bconstant + bAC250_ind2 0.57
75<AC250 Log odds = bconstant + bAC250_ind3 1.45