Table 2. Evaluation of EWIs in each of the 40 surveyed sites during the year 2010.
Region | Name of the ART site | EWI 1(Required target: 100%) | EWI 2(Required target: ≤20%) | EWI 3(Required target: ≥70%) | EWI 4(Required target: ≥90%) | EWI 5(Required target: 100%) | Regional Performance (% acceptable target) |
Adamawa | Hop Protestant Luth N’déré | 100% (110/110) | 77% (84/110) | 19% (21/110) | 19% (21/110) | 100% (12/12) | 30% (3/10) |
Hop Régional de N’déré | 100% (145/145) | 46% (66/144) | 49% (71/145) | 23% (34/145) | 42% (5/12) | ||
Centre | Hop Central Ydé | 100% (180/180) | 39% (64/165) | 55,3% (94/170) | 32% (58/180) | 67% (8/12) | 36% (14/39) |
CHE/CNPS | 99% (158/160) | 20% (20/132) | 56,3% (90/160) | 37% (58/157) | 100% (12/12) | ||
HD Mbalmayo | 100% (96/96) | 49% (46/93) | 40,6% (39/93) | 35% (30/86) | 100% (12/12) | ||
HD Mfou | 100% (98/98) | 47% (41/87) | 49,5% (46/93) | 20% (20/102) | 58% (7/12) | ||
Hop. Gynéco Pédiatrique Ydé | 100% (100/100) | 4% (4/100) | 85% (83/98) | 73% (73/100) | 100% (12/12) | ||
HD Cité Verte | 100% (100/100) | 51% (51/100) | 41,6% (45/108) | NV | 100% (12/12) | ||
Hop. Jamot Ydé | 100% (155/155) | 43% (60/139) | 50% (73/145) | 56% (86/153) | 75% (9/12) | ||
Hop Général de Ydé | 100% (135/135) | 35% (47/135) | 56,3% (76/135) | 29% (39/135) | 58% (7/12) | ||
Far North | CTA HR Maroua | 100% (155/155) | 39% (55/141) | 44% (66/149) | 12% (19/155) | 92% (11/12) | 23% (3/13) |
HD Kousseri | 100% (75/75) | 45% (28/66) | 42,5% (31/73) | 8% (6/75) | 92% (11/12) | ||
HR Annexe de Pete | 100% (100/100) | 56% (44/92) | 35% (32/92) | NV | NV | ||
East | HR Bertoua | 100% (145/145) | 10% (14/145) | 90% (130/145) | 6% (8/144) | 50% (6/12) | 67% (10/15) |
HD Abong mbang | 100% (110/110) | 20% (22/110) | 76% (69/91) | 29% (32/110) | 100% (12/12) | ||
CMA Belabo | 100% (38/38) | 22% (8/37) | 73,7% (28/38) | 11% (4/38) | 100% (12/12) | ||
Littoral | HR Nkongsamgba | 100% (140/140) | 77% (104/135) | 55,3% (72/138) | NV | 100% (12/12) | 44% (12/27) |
HD Edea | 100% (46/46) | 7% (3/43) | 70% (30/43) | 14% (6/43) | NA | ||
HG Douala | 99% (158/160) | 38% (60/160) | 36,5% (159) | 50% (74/147) | 100% (12/12) | ||
HD Nylon Doual | 100% (175/175) | 58% (101)175) | 44% (70/159) | 12% (20/171) | 100% (12/12) | ||
Hôp. St Jean Malte | 100% (110/110) | 33% (36/108) | 37,1% (39/105) | NV | 100% (12/12) | ||
Hopital Laquintine, Douala | 99% (158/160) | 33% (53/160) | 59,6% (93/156) | 34% (54/160) | 100% (12/12) | ||
North | HR Garoua | 100% (155/155) | 40% (53/133) | 46,7% (72/154) | 3% (5/152) | 75% (9/12) | 20% (3/15) |
Centre Médical de la SN, Garoua | 100% (75/75) | 36% (21/56) | 52,2% (36/69) | 26% (18/69) | 42% (5/12) | ||
HD Guider | 100% (134/134) | 33% (33/99) | 40,6% (54/133) | 11% (14/128) | 67% (8/12) | ||
North-West | HR Bamenda | 100% (172/172) | 41% (68/167) | 49% (82/167) | 34% (50/146) | 17% (2/12) | 20% (4/20) |
HD Ndop | 100% (127/127) | 29% (36/126) | 57,5% (73/127) | 29% (36/126) | 0% (0/12) | ||
Mbingo baptist Hops | 100% (100/100) | 32% (30/95) | 60% (62/104) | 43% (45/104) | 50% (6/12) | ||
Poly clinic Mezzam | 100% (114/114) | 25% (28/114) | 53% (62/117) | 21% (26.125) | 42% (5/12) | ||
West | HR Bafoussam | 99% (153/155) | 29% (44/150) | 62% (96/155) | 17% (27/156) | 100% (12/12) | 35% (7/20) |
HD Foumbam | 100% (140/140) | 22% (28/130) | 71% (95/134) | 1% (2/140) | 100% (12/12) | ||
HD Bagangté | 100% (56/56) | 39% (18/46) | 42% (23/55) | 23% (17/75) | 50% (6/12) | ||
HD Dschang | 100% (72/72) | 35% (24/69) | 54% (39/72) | 28% (28/99) | 100% (12/12) | ||
South | HR Ebolowa | 100% (110/110) | 38% (41/110) | 53,6% (59/110) | 16% (17/108) | 92% (11/12) | 40% (6/15) |
HD Ambam | 100% (75/75) | 17% (13/75) | 82,7% (62/75) | 39% (29/75) | 92% (11/12) | ||
HD Kribi | 100% (100/100) | 42% (39/93) | 49% (49/100) | 39% (38/97) | 100% (12/12) | ||
South-West | CTA Limbe | 100% (160/160) | 19% (30/160) | 44,5% (68/153) | 0% (0/160) | 42% (5/12) | 40% (8/20) |
Baptist Hops Mutengene | 100% (124/124) | 28% (34/128) | 24,2% (30/124) | 39% (44/114) | 100% (12/12) | ||
HD Kumba | 100% (135/135) | 32% (41/129) | 46% (60/131) | 7% (9/135) | 17% (2/12) | ||
HR Buea | 100% (110/110) | 14% (13/90) | 71,6% (73/102) | 25% (27/109) | 25% (3/12) |
In “ Bold ”: EWI reaching the required target. NV: Not Validated. NA: Not Available.
EWI: Early Warning Indicator.
EWI1: Percentage of patients initiated on an appropriate first line ARV drug regimen, following national guidelines (Required target performance: 100%);
EWI2: Percentage of patient lost to follow-up after 12 months of enrolment to ART (Required target performance: ≤20%);
EWI3: Percentage of patient retained on appropriate first line ART after 12 month of treatment (Required target performance: ≥70%);
EWI4: Percentage of patients picking-up their ARV drugs on-time at the pharmacy of the ART site (Required target performance: ≥90%);
EWI5: Percentage of months without ARV drug shutdown at the pharmacy of the ART site (Required target performance: 100%).