Skip to main content
. Author manuscript; available in PMC: 2013 May 30.
Published in final edited form as: Talanta. 2012 Mar 21;94:227–231. doi: 10.1016/j.talanta.2012.03.026

Table 3.

Parameters for calibration curves measured on days one, two, five, nine, ten, and nineteen after EC probe fabrication.

Day Slope (A/mgL−1) Intercept R2 DL (mgL−1)
1 1.13E-08 4.55E-10 0.99 0.02
2 1.07E-08 −8.12E-11 0.99 0.04
5 9.70E-09 −6.06E-10 0.99 0.12
9 9.55E-09 1.65E-10 0.99 0.04
10 1.19E-08 −3.72E-10 0.99 0.08
19 1.29E-08 3.24E-11 0.99 0.13