Skip to main content
. 2012 Jan 4;9(72):1470–1485. doi: 10.1098/rsif.2011.0800

Figure 12.

Figure 12.

Plot of expected time to completion for N parallel copies of catalyst gates with (solid line with filled circles) and without (solid line with filled triangle) garbage collection. (Online version in colour.)