Skip to main content
. 2012 Mar 8;11:12. doi: 10.1186/1476-069X-11-12

Table 3.

Multivariate linear regression models for normalised cycle volume

Path Lane Total
Estimate SE p-value Estimate SE p-value Estimate SE p-value

Hourly cycle volume (6:00 am to 8:00 pm)

Intercept 0.885 0.046 0.475 0.057 0.722 0.042

Maximum gust speed (km/h) -0.014 0.001 < 0.0001 -0.014 0.001 < 0.0001 -0.014 0.001 < 0.0001

Rain (mm) in an hour -0.106 0.015 < 0.0001 -0.101 0.014 < 0.0001 -0.106 0.014 < 0.0001

Maximum temperature (°C) 0.023 0.003 < 0.0001 0.048 0.004 < 0.0001 0.032 0.003 < 0.0001

Hour with sunshine 0.247 0.027 < 0.0001 0.268 0.031 < 0.0001 0.262 0.026 < 0.0001

R2 = 0.16 R2 = 0.19 R2 = 0.23

Daily cycle volume

Intercept 0.960 0.096 0.414 0.103 0.730 0.091

Maximum gust speed (km/h) -0.011 0.001 < 0.0001 -0.007 0.001 < 0.0001 -0.009 0.001 < 0.0001

Rain (mm) in a day -0.014 0.002 < 0.0001 -0.016 0.003 < 0.0001 -0.015 0.002 < 0.0001

Maximum temperature (°C) 0.019 0.004 < 0.0001 0.037 0.005 < 0.0001 0.026 0.004 < 0.0001

Sunshine hours in a day 0.020 0.004 < 0.0001 0.033 0.004 < 0.0001 0.025 0.004 < 0.0001

R2 = 0.49 R2 = 0.57 R2 = 0.56