Table 1.
Calculation of the required measurement precisions for the cases of two profiles (in the beginning and at the end of rail).
| Desired precision of coordinate differences | |||||
|---|---|---|---|---|---|
|
| |||||
| when measuring two points | |||||
| in the beginning of the rail | at the end of the rail | ||||
| Tleft | Tright | Tleft | Tright | ||
| horizontal direction | 209° | 359° | 292° | 315° | |
| zenith distance | 129° | 115° | 104° | 103° | |
| slope distance | 7 m | 13 m | 53 m | 55 m | |
| required precision of measurements | |||||
| σs | 53.4″ | 14.6″ | 3.5″ | 3.4″ | |
| σz | 62.5″ | 20.6″ | 3.4″ | 3.4″ | |
| σd | 1.8 mm | 1.3 mm | 0.9 mm | 0.9 mm | |