Skip to main content
. 2011 May;127(5):e1176–e1181. doi: 10.1542/peds.2010-2158

TABLE 1.

Total Program Implementation Costs Including Training and Maintenance During the 12-Month Intervention Period

Item Quantity Cost, US $ Total Cost, US $
Bags/masks 36 25.00 900.00
Stethoscope 18 10.00 180.00
Stopwatches 18 8.12 146.16
Scales 18 96.00 1728.00
Duffel bags 18 9.99 179.82
Dolls 18 20.00 360.00
Sippy Cups 18 0.43 7.74
Mannequins 18 90.00 1620.00
Baby blankets 18 0.67 12.06
PCPNC books 18 40.00 720.00
Binders, supplies 18 19.35 348.30
ENC trainer manual 18 10.00 180.00
ENC participant books 18 5.00 90.00
Shipping 1 599.42
Training costa 1 2880.00
Travelb 1 3216.33 3216.33
Part-time nursec 2 3528.00 7056.00
Total 20 223.83
a

The cost to hold the 5-day training for 18 participants, including board and lodging.

b

The master trainer traveled from abroad to conduct the 5-day training on a voluntary basis, but travel costs were covered.

c

Two part-time nurses (in Lusaka and Ndola) hired (December 2005 to November 2006) for teaching and maintenance purposes. Monthly salary was $294 per month per nurse.