Skip to main content
. 2012 Jul 16;7(7):e39996. doi: 10.1371/journal.pone.0039996

Figure 4.

Figure 4

a. Cost Path identified by Run Option II. b. Cost Path identified by Run Option III. c. Weak links along path identified by Run Option III.