Building site |
Campus area |
TCP |
Hospital area downtown |
Building type |
Stand-alone |
TCP |
Separate; next to hospital building |
|
|
HMGU |
Integrated into a large facility building on a single level |
|
|
BRC |
Located on a single level in a large basement shared among 5 buildings |
|
|
JAX |
Facilities integrated into a large research building on different levels |
Structure |
Holding floors above ground |
BRC, TCP |
Holding floors underground |
|
Technical plants located above holding floors |
HZI |
Technical plants located in roof space and basement; supply to the holding floors via ducts |
|
|
ICS |
Technical plants located in roof space; supply of the holding floors via shafts |
|
|
IRC |
Technical plants located in basement below holding floors |
Construction |
Concrete skeleton |
MLC, RSF |
Steel skeleton |
|
|
Harlan, IRC |
Massive |
Walls |
Dry partition walls |
HZI |
Concrete and clean-room wall system (demountable) |
|
|
BRC |
Clean-room wall system |
|
|
HMGU, IRC |
Masonry |
Floor |
Concrete–screed–epoxy coating flooring system |
ICS |
Tiles (will be replaced by PVC flooring with welded-joint sheets) |
|
|
MLC, RSF |
PVC flooring |
Ceiling |
Clean-room ceiling panel system |
HZI, GMC, ICS, IRC |
Concrete, polyurethane, or acryl coating |
Air supply |
Holding rooms: HEPA filtration; 15 to 20 air changes hourly; 20 to 22 °C |
HZI, JAX |
12 air changes hourly |
|
|
MLC, RSF |
F9 filtration |
Disinfection |
H2O2 by generator; decentralized |
HZI |
Centralized H2O2 gassing by ventilation plants |
|
|
ICS |
Chlorine dioxide; decentralized |
Specialties |
Design |
RSF, TCP, BRC |
Renovation or conversion of each room from technical floor is possible |