Skip to main content
. 2012 Jan 30;5(Suppl 1):17–30. doi: 10.4137/BII.S8948

Table 8.

The summary of the evaluation of the three submission runs (Expected—the gold-standard results; Predicted—the results that the system predicted).

#Expected #Predicted #Correct P R F
Run 1 1272 1403 810 0.5780 0.6375 0.6063
Run 2 1272 1560 865 0.5545 0.6803 0.6108
Run 3 1272 1419 826 0.5821 0.6493 0.6139