Skip to main content
. 2012 Mar 8;3(1):31–42. doi: 10.5491/SHAW.2012.3.1.31

Fig. 8.

Fig. 8

Average of time-to-fatigue between metal stamping lines and handwork section during beginning of the workday. L: left, R: right, ES: erector spinae, GS: gastrocnemius, TA: tibialis anterior.