Table 3.

Results scenario 4 and 5

Total penalty costs Initial OR schedule Realized OR schedule
Original Optimal Original Optimal
Cancellation 0.00 0.00 66.67 22.22
Patient 0.00 0.00 40.91 36.50
Ward 0.00 0.00 34.40 28.56
Holding 0.00 0.00 0.00 0.00
OR assistants 0.00 0.68 6.43 4.20
Recovery 4.93 0.74 8.85 3.11
Radiology 1.63 0.56 2.41 1.07
Pathology 0.64 0.15 0.70 0.51
Logistics 0.00 0.00 9.26 5.93
Total costs 3.00 1.03 87.03 35.82