Table 3.
Total penalty costs | Initial OR schedule | Realized OR schedule | ||
---|---|---|---|---|
Original | Optimal | Original | Optimal | |
Cancellation | 0.00 | 0.00 | 66.67 | 22.22 |
Patient | 0.00 | 0.00 | 40.91 | 36.50 |
Ward | 0.00 | 0.00 | 34.40 | 28.56 |
Holding | 0.00 | 0.00 | 0.00 | 0.00 |
OR assistants | 0.00 | 0.68 | 6.43 | 4.20 |
Recovery | 4.93 | 0.74 | 8.85 | 3.11 |
Radiology | 1.63 | 0.56 | 2.41 | 1.07 |
Pathology | 0.64 | 0.15 | 0.70 | 0.51 |
Logistics | 0.00 | 0.00 | 9.26 | 5.93 |
Total costs | 3.00 | 1.03 | 87.03 | 35.82 |