Table 2.
An overview of the anticipated pattern of text segments for intervention a-c
The anticipated pattern should: |
Intervention A |
Intervention B |
Intervention C |
|||
---|---|---|---|---|---|---|
Code | Description | Code | Description | Code | Description | |
mainly contain |
M1-3 |
Descriptions of effects on mental level |
M6 |
New input dev-eloped/ added to the team mental model |
M8 |
Team taking further action |
M1-3 a1 |
Positive valuation of procedure/activities, process/instrument as facilitating the activating/structuring of TMM. |
M6a1 |
Positive valuations of new useful input or idea |
M8a1 |
Positive valuation of action or signed contract/action plan |
|
M6 |
New input developed /added to TMM |
|||||
M6a1 |
Positive valuations of new useful input/ idea |
|||||
partly contain |
M4 |
Minor corrective action taken for non-complex problems illuminated |
M5 |
Peer-review panel confirming own findings (already established TMM) |
M5 |
Written feedback confirming own findings (already established TMM) |
M0a1 |
General positive valuation |
M5a1 |
Positive valuation of positive/ confirming /strengthening feedback from the review panel |
M5a1 |
Positive valuation of the written feedback containing positive/ strengthening/ confirming info |
|
M8 |
Team taking further action |
M0a1 |
General positive valuation |
|||
M0a1 |
General positive valuation |
|
|
|||
not/to minor extent contain |
M1-3 a2 |
Negative valuation connected to mental effects |
M5a2 |
Review panel overly acknowledging own findings (no new input) |
M5a2 |
Written overly acknowledging own findings (no new input) |
|
M4a2 |
Negative valuation of actions being taken |
M6a2 |
Negative valuation of new useful input |
M6a2 |
Negative valuation of new useful input |
|
M0a2 |
General negative valuation |
M7a2 |
Peer review having a disturbing/disrupting effect on the building of TMM |
M7a2 |
Written feedback having a disturbing/ disrupting effect on the building of TMM |
|
|
|
M8a2 |
Negative valuation of actions being taken |
M8a2 |
Negative valuation of actions being taken or signed action plan |
M0a2 | General negative valuation | M0a2 | General negative valuation |