Skip to main content
. 2012 Oct 21;2012:583973. doi: 10.1100/2012/583973

Figure 4.

Figure 4

Parameter values were NP = 30, p a = 0.25. (a) Path-planning original results comparison between basic CS and improved CS in a three-dimension space. (b) Route comparison after using the smoothing strategy in a three-dimension space. (c) Path-planning original results comparison between basic CS and improved CS in a two-dimension space. (d) Route comparison after using the smoothing strategy in a two-dimension space. (e) Evolution curves comparison between the basic CS and the improved CS.