Skip to main content
. 2012 Sep 27;7(1):536. doi: 10.1186/1556-276X-7-536

Table 1.

Comparison ofϕf and Stokes shift of CdTe QDs

Synthesis time GSH
TGA
MPA
TGH
ϕf(%) Stokes shift (meV) ϕf(%) Stokes shift (meV) ϕf(%) Stokes shift (meV) ϕf(%) Stokes shift (meV)
30 min
38
162
70
289
44
222
15
380
1 h
49
160
58
211
73
231
38
353
2 h
35.5
134
54.5
224
71
207
20
329
4 h 31 169 14.5 206 63.5 180 13 297

CdTe QDs capped with GSH, TGA, MPA, and TGH at different synthesis times.