Skip to main content
. 2012 Nov 7;7(11):e48434. doi: 10.1371/journal.pone.0048434

Figure 2. Error rates (mean ± SEM) as a function of remaining costs.

Figure 2

A Effort-sensitive monkeys. B Effort-insensitive monkeys. Red triangles and black circles are work and delay trials, respectively. Black and grey lines are best fit lines for Eqs. 3 and 5, respectively.