Table 2.
Time window |
T/nt |
T/nt × Anterior/posterior |
T/nt × Hemisphere |
T/nt × Anterior/posterior × Hemisphere |
||||
---|---|---|---|---|---|---|---|---|
ms | F(1, 21) | p | F(5, 105) | p | F(2, 42) | p | F(10, 210) | p |
100–140 | 14.915 | 0.001 | 3.3 | ns | <1 | ns | 1.271 | ns |
175–225 | 8.032 | 0.01 | 4.244 | 0.04 | 2.501 | ns | 1.203 | ns |
225–250 | <1 | ns | 12.756 | <0.001 | 1.279 | ns | <1 | ns |
300–350 | 6.142 | 0.022 | 8.22 | 0.003 | 3.462 | 0.041 | 2.141 | ns |
450–500 | 6.18 | 0.021 | 2.64 | ns | <1 | ns | <1 | ns |
500–600 | 3.386 | ns | 3.56 | 0.035 | <1 | ns | 1.515 | ns |
650–900 | 2.027 | ns | 11.794 | <0.001 | 3.294 | 0.047 | 2.890 | 0.022 |
1400–1800 | 4.927 | 0.038 | 1.243 | ns | 3.098 | ns | 2.335 | ns |
α < 0.05; see Section “Think Versus No-think ERP Effects” and Figure 2 for direction of effects.