Skip to main content
. 2012 Sep 18;22(1):148–155. doi: 10.1007/s00586-012-2494-6

Table 1.

The comparison of five techniques for C3–C7 pedicle screw placement

Group N OTa (min) Excellent Fair Poor E/F portion
1 80 27 ± 3.0 29 21 30 62.5 % (50/80)
2 78 112 ± 10.3 35 29 14 82.1 % (64/78)
3 80 69 ± 6.4 34 36 10 87.5 % (70/80)
4 80 98 ± 11.0 70 10 0 100 % (80/80)
5 80 91 ± 6.0 72 8 0 100 % (80/80)

aOperation time per specimen