Table 3.
Percentage deviation and absolute deviation of predicted time temperature
| Package no | Location | Infinite slab | Finite slab | ||
|---|---|---|---|---|---|
| % absolute deviation | Absolute deviation | % absolute deviation | Absolute deviation | ||
| 1 | Center n = 0.4 | 3.3 | 0.40 | 17.8 | 1.00 |
| 3.2 | 0.06 | ||||
| 2 | Center n = 0.4 | 2.6 | 0.22 | 0.04 | 0.65 |
| 4.9 | 0.19 | ||||
| 3 | Center n = 0.4 | 2.6 | 0.37 | 2.8 | 0.38 |
| 1.9 | 0.18 | ||||