Table 2.
YRPV*DQY, b6 transition
| |||||
---|---|---|---|---|---|
ExpectedAmount (fmol) | # of replicates | Calculated Amount (fmol) | Standard Deviation | RSD | Accuracy |
0.080 | 5 | 0.080 | 0.002 | 2.0 | 99.5 |
0.14 | 5 | 0.14 | 0.007 | 4.9 | 97.5 |
0.40 | 5 | 0.42 | 0.01 | 3.4 | 104.7 |
8.0 | 5 | 8.4 | 0.3 | 3.3 | 105.4 |
40 | 5 | 35 | 2 | 4.6 | 86.6 |
100 | 5 | 108 | 2 | 1.9 | 107.8 |
200 | 5 | 197 | 10 | 5.2 | 98.5 |
RPV*DQY, b5 transition
| |||||
ExpectedAmount (fmol) | # of replicates | Calculated Amount (fmol) | Standard Deviation | RSD | Accuracy |
| |||||
0.080 | 5 | 0.069 | 0.007 | 10.6 | 86.5 |
0.14 | 5 | 0.15 | 0.02 | 11.1 | 107.6 |
0.40 | 5 | 0.40 | 0.04 | 10.3 | 99.7 |
40 | 5 | 45 | 5 | 10.3 | 111.7 |
100 | 5 | 94 | 12 | 13.0 | 93.5 |
200 | 5 | 202 | 24 | 11.6 | 100.9 |
The RSD and accuracy of each point on the calibration curve are < 15% of the real value.