Table 5.
Estimation error, sign a priori information.
| SNR | 10dB | 20dB | 40dB | ∞ |
|---|---|---|---|---|
| N=5,000 | 0.0093 | 0.0028 | 0.0005 | 0.0003 |
| N=10,000 | 0.0057 | 0.0014 | 0.0002 | 0.0001 |
Estimation error, sign a priori information.
| SNR | 10dB | 20dB | 40dB | ∞ |
|---|---|---|---|---|
| N=5,000 | 0.0093 | 0.0028 | 0.0005 | 0.0003 |
| N=10,000 | 0.0057 | 0.0014 | 0.0002 | 0.0001 |