Skip to main content
. 2013 Mar 28;8(3):e59847. doi: 10.1371/journal.pone.0059847

Table 2. Mean responses for Experiment 1c.

Duration Estimate Subjective Impression
Dec Acc Dec Acc
Retrospective M 110.25 116.16 .376 .414
SD 39.15 50.99 .169 .148
Prospective M 103.14 99.39 .394 .402
SD 46.36 44.93 .163 .180

Duration estimates are in seconds. Dec = Decelerating; Acc = Accelerating.