Skip to main content
. 2013 Mar 22;7:37. doi: 10.3389/fncir.2013.00037

Figure 3.

Figure 3

Learning curves for control strategies. The average missing information is plotted over exploration time for the unembodied positive control and random action baseline control. Standard errors are plotted as dotted lines above and below learning curves (n = 200).