Skip to main content
. 2013 May 4;3(5):e002497. doi: 10.1136/bmjopen-2012-002497

Figure 1.

Figure 1

Bland-Altman plot between the objective and patient-assessed surgery durations. The solid line indicates the mean difference (or bias); the blue and red dash lines indicate the 95% and 68% limits of the agreement, respectively.