Skip to main content
. 2013 Apr 28;2013:545613. doi: 10.1155/2013/545613

Table 2.

Root Mean Square Error of forecast comparison.

Forecasting time points 500 (training time points) 1000 (training time points)
ANN Fuzzy NN CA-AR (5) ANN Fuzzy NN CA-AR (5)
150 0.2059 0.1210 0.1462 0.0162 0.1297 0.0721 0.0950 0.0114
1500 0.6174 0.1050 0.0541 0.3221 0.0887 0.0533
2000 0.6328 0.0998 0.0487 0.356 0.0918 0.0486
2500 0.7607 0.0995 0.0497 0.3741 0.0910 0.0507
3000 0.7801 0.0976 0.0480 0.3613 0.0874 0.0479