Table 4.
Labor force and embryo costs according to time in different embryo rescue methods.
| Methods | Embryo number/day | Income ($) | For 1000 plants | ||
|---|---|---|---|---|---|
| Time (day) | Labor ($) | Haploid plant/labor force ($) | |||
| Method 1 | 21.96 | 658.8 | 46.1 | 849.62 | 0.8 |
| Method 2 (CP) | 46.26 | 1387.8 | 21.7 | 399.93 | 0.4 |
| Method 2 (E20A) | 21.20 | 636.00 | 46.0 | 847.78 | 0.8 |
| Method 3 | 85.52 | 2565.6 | 11.6 | 213.78 | 0.2 |
| Method 5 (CP) | 5.33 | 159.9 | 202.0 | 3722.86 | 3.7 |
| Method 5 (E20A) | 2.13 | 63.9 | 473.5 | 8726.60 | 8.7 |