Table 3.
Step 1: Process review |
---|
Step 2: Potential failure modes |
Step 3: Potential effects of each failure mode |
Step 4: Assign a severity rating |
Step 5: Assign an occurrence rating |
Step 6: Assign a failure rating |
Step 7: Calculate the risk priority number (RPN) for each effect |
Step 8: Prioritise the failure modes |
Step 9: Take action to reduce or eliminate the high risk failure modes |
Step 10: Recalculate the RPN |