Skip to main content
. 2013 Jun 27;8(6):e67280. doi: 10.1371/journal.pone.0067280

Figure 1. Population structure of the 230 accessions using SSR and DArT markers, as estimated using the model-based Bayesian algorithm implemented in the STRUCTURE programme (K = 2).

Figure 1