Table 1. Accuracy ± standard deviation obtained with F-speed films and storage phosphor plate (SPP) images after 60 h, 80 h, 100 h and 120 h of acid demineralization.
60 h | 80 h | 100 h | 120 h | |
SPP | 0.59 ± 0.11 | 0.60 ± 0.05 | 0.60 ± 0.05 | 0.72 ± 0.05 |
Film | 0.53 ± 0.09a,b | 0.56 ± 0.05a,b | 0.73 ± 0.04 | 0.79 ± 0.04 |
a Indicates significance with 100 h of demineralization.
b Indicates significance with 120 h of demineralization.