Skip to main content
. 2013 Aug 19;8(8):e72451. doi: 10.1371/journal.pone.0072451

Table 2. Sample sizes and accuracy metrics for all native models and projections.

Training Landscape United States
Italy
Kazakhstan
Projection Native IT KZ Native KZ US Native KZ IT US
Training 48 - - 28 - - 24 - - -
Testing 12 35 39 7 39 60 8 15 35 60
AUC 0.93 0.51 0.48 0.84 0.56 0.43 0.90 0.71 0.45 0.48
SE 0.05 0.05 0.05 0.09 0.05 0.04 0.09 0.08 0.05 0.04
Z 5.84 7.72 5.99 3.86 97.91 16.42 3.13 4.52 15.93 7.71
Total Omission 0 62.1 13.2 0 86.8 96.4 0 0 0 0
Average Omission 6.7 71 51 1.4 74.8 82.2 0 19.2 10 17.7
Total Commission 8.38 0 0.84 27.86 0 0 19.77 13.17 9.04 28.67
Average Commission 22.88 7.71 43.54 50.21 0.05 3.17 46.3 54.28 90.9 83.35
SAO 16.67 - 89.47 14.29 - 100 0 46.15 100 62.50

Native projection are under the curve (AUC) scores are shown in bold for comparison. SE = standard error, Z = z-score, SAO = summed area omission.

Native training and testing are for southern training area only

statistically significant value