Skip to main content
. 2013 Jun 11;121(9):1017–1025. doi: 10.1289/ehp.1206010

Table 5.

Point estimates ± SEs and 95% CIs for the different pollutants, using naïve analysis and with bootstrap correction for measurement error in covariate of interest.

PM2.5 component Analysis/­correction β̂xa±SE 95% CI
EC (μg/m3) Naïve 0.001±0.014 –0.03, 0.03
PB,b λ=0 0.001±0.015 –0.03, 0.03
PB, λ=1 0.001±0.015 –0.03, 0.03
OC (μg/m3) Naïve 0.025±0.008 0.01, 0.04
PB, λ=0 0.025±0.008 0.01, 0.04
PB, λ=1 0.025±0.008 0.01, 0.04
Si (ng/m3) Naïve 0.408±0.081 0.25, 0.57
PB, λ=0 0.408±0.126 0.16, 0.66
PB, λ=1 0.408±0.127 0.16, 0.66
S (μg/m3) Naïve 0.055±0.017 0.022, 0.088
PB, λ=0 0.055±0.025 0.006, 0.104
PB, λ=1 0.055±0.025 0.006, 0.104
Point estimates are estimates of the increase in CIMT for a 1-unit increase in each pollutant. aIn the case of λ=1, β̂x refers to the estimate corrected for any bias from ­classical-like error. bPB refers to results from parame­ter bootstrap implemented with given value of λ.