Skip to main content
. 2013 Sep 6;8(9):e68610. doi: 10.1371/journal.pone.0068610

Figure 2. Inactive concessions superimposed on the risk indicator map.

Figure 2

Low risk (green); High risk (orange); Very High risk (red).